page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37 page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
< prev - next > Energy Wind power wind_turbine_pmg_manual (Printable PDF)
39. THE BOX SECTION SPINE
DRILL HOLES WITH A PILLAR DRILL FOR ACCURATE ALIGNMENT
Ø8 Ø25 30 50
355
380
Weld the shaft in the 25mm hole. Take care to hold the shaft as square as possible
(90 degrees) to the spine, when welding it.
The bearing hub (diagram 40) fits on the shaft. It has two 50x25 mm deep-groove
ballraces in it, with a spacer between them. It needs a plastic cap over the end to
keep dirt out of the bearings.
Do not forget to grease the bearings. Pack them with grease around half of their
circumference only. Do not fill them entirely or they will become stiff to turn.
40. THE BEARING HUB
Ø10
Ø120
PCD102
Ø65
63
8 Ø32 Ø25
25 25
35 20
PMG manual
page 37
June 2001